green doha railing systems

Qatar Rail Website Home

Qatar Rail takes pa... 24 Sep 2018 Qatar Rail has taken a part in InnoTrans International Trade Fair which took place last week in Berl...

Get Quotes

Doha Metro - Wikipedia

The Doha Metro is a rapid transit system currently under construction in Doha, Qatar's capital city, that is scheduled to become operational by the end of 2018. It will have four lines with an approximate overall length of 300 km and 100 stations. [3]

Get Quotes

Doha Metro - Railway Technology

Doha Metro in Qatar’s capital city will be one of the most advanced rail transit systems in the world when Phase I becomes operational by the end of 2019.

Get Quotes

Doha Metro Green Line - Hill International

Hill is providing project management services in connection with construction of the Green Line, one of four lines of the new Doha Metro transit system. Phase 1 of the project involves construction of an 18 KM track with 15 km of underground track.

Get Quotes

LEED Certification in Qatar | Green Building Services in India

In Construction industry, Commissioning is verifying that the building systems and the subsystems (HVAC, plumbing, electrical, fire/life safety, building envelopes, interior systems, utility plants, sustainable systems, lighting etc.) are planned & designed.

Get Quotes

Doha Metro | Qatar | Louis Berger

The Louis Berger Egis Rail joint venture (LBERJV) in association with the Qatar Program Management Company (QPM) provides project management, construction management, design management and commercial management for at-grade, above grade and underground metro corridors and multi-modal station structures.

Get Quotes

Green light for Doha Metro construction

Green light for Doha Metro construction. From Europe, to Asia, Africa and North and South America, Talgo is a global rail systems and rail vehicles’ provider, its success relying on its 75 years’ experience. 44 countries benefit from Talgo’s quality products.

Get Quotes

Doha Metro - Qatar Rail

The metro system will be built in two phases: the first will see the construction of three out of the four lines (Red, Gold, and Green) and 37 stations.. The largest station, Msheireb, will fall at the heart of the Doha Metro with the Red, Green and Gold lines all meeting at this point.. QATAR RAIL® 2018.

Get Quotes

Product Details

Product List